Products

 

Water Gutter Roll Forming Machine

Water Gutter Roll Forming Machine Water Gutter Roll Forming Machine Water Gutter Roll Forming Machine
Product name:Water Gutter Roll Forming Machine
Item:Kin-80
Details:
GUTTER ROLL FORMING MACHINE

 

 2. The Chart of Process flow

Decoiling→ feeding→ pressing and forming the shape→ measure the length→ cutting→ receiving the plates

 

3. The equipment includes:

序号
NO.
名称
Name
数量
Quant.
备注
Remark
1
de-coiler
1

inter expanding type Inner diameter of coil: φ508mminner expansion range: ф480-520 mm

 

Capacity load3T

2
Guider
1
 
 3
Main forming machine
 1

12, forming stations, 5.5kw main motor. Width of material: 230mm≤§≤280mm,280mm≤§≤350mm, thickness: 0.6-0.9mm, Material of roller: GCr15

4
Moving hydraulic cutting machine
1

Cutting blade: 1 sets

5
RECEIVE table
 
1
 
6
Electric panel
1
PLC control system
4. Technical specifications and details
Main forming machine

Number of forming steps: 12 steps

Material of shaft: 45# steel adjustable treatment. Outer diameter 50mm

Material of rollers: GCr15 Quenching treatment,HRC58-60°

Main motor power: 5.5kw frequency conversion motor, autocephaly distribute gear case  380V 50HZ 3PH (please confirm)

The forming speed:10-15m/min
Width of the material : 230mm≤§≤280mm,280mm≤§≤350mm
Thickness of the material: 0.6-0.9 mm

Adjust part:Turky emendation type(three-dimensional emendation)

Hydraulic cutter

Material of blade: Cr12 mould steel with quenched treatment60-62

Cutting system: adopt advanced hydraulic drive, automatically cutting after forming, no distort, no wasting, high safe factor.

Function and structure: cutting the forming sheet.

The electrical control system

•        PLC                 Encoder               

•        Controlling screen      electric relay            

•        circuit breaker          Limit switch             

 Hydraulic system
Power: 3KW
Function: apply power for cutting machine

5. The total price of the equipment:

 6. Payment: 50% T/T prepaid, and pay the balance before loading.

7. Delivery time: 60 days
8. Guarantee period: one year.
9. Installation and training:

The equipment guarantees time is one year, the supplier should be responsible for replacement parts as the equipment non-artificial reason damage in the guarantees term.

The seller supply technical data(including forming mould drawing, electrical elements drawing and equipment drawing etc.)

Training: Our company offer training with free charge.

Installation : buyer pay the domestic and abroad cost ,help seller engineer got visa .

Your name:
Your E-mail: *
Message: *
Enter your inquiry details such as product name, color, size, MOQ, FOB, etc.
Code: *
 
 

Related Products :
 
 


Products List


Contact Us

Name: Jack
Add: Nancang Street ,Botou city, Hebei Province
Tel: 86-317-8228588
Fax: 86-317-8319789
Mobile: 86-15075442679
Email: sales@kinberlymc.com
MSN: btjbl@hotmail.com Skype: mon.ji1 Trademanager ID:cn1500338042